- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
南水北调穿黄隧洞有粘结环锚预应力施工重难点分析
收稿日期: 2013-08-20
修回日期: 2013-12-02
网络出版日期: 2014-01-21
Key Points in Implementation of Bonded Circumferential Prestressing of Yellow River Crossing Tunnel on SouthtoNorth Water Diversion Project
Received date: 2013-08-20
Revised date: 2013-12-02
Online published: 2014-01-21
孙振川 , 仲生星 . 南水北调穿黄隧洞有粘结环锚预应力施工重难点分析[J]. 隧道建设, 2014 , 34(1) : 73 -77 . DOI: 10.3973/j.issn.1672-741X.2014.01.012
Yellow River Crossing Tunnel on SouthtoNorth Water Diversion Project is the first tunnel in China where composite lining consisting of primary segment lining and prestressed insitucast reinforced concrete secondary lining is adopted. The diameter of the secondary lining of the tunnel is 7 m, while the thickness thereof is 45 cm, i.e., only 1/16 of the diameter thereof. Therefore, the prestressed insitucast reinforced concrete lining of the tunnel is thinner than that in normal cases. On the other hand, one single anchor cable of the prestressed insitucast reinforced concrete lining will undertake 2 250 kN tensioning force, i.e., the prestress is higher. Under these conditions, problems, such as cracks of the anchor tool channels, insufficient elongation of steel stands and jamming of embedded corrugated pipes, may occur. In the paper, solutions for these problems are studied by means of theoretical analysis and insitu tensioning tests. The paper can provide reference for similar projects in the future.
/
| 〈 |
|
〉 |