地面出入式盾构隧道修正惯用法计算参数研究
收稿日期: 2013-12-05
修回日期: 2014-01-23
网络出版日期: 2014-02-27
Study on Ground Penetrating Shieldbored Tunnel Calculation Parameters in Modified Routine Method
Received date: 2013-12-05
Revised date: 2014-01-23
Online published: 2014-02-27
张银屏 . 地面出入式盾构隧道修正惯用法计算参数研究[J]. 隧道建设, 2014 , 34(2) : 101 -106 . DOI: 10.3973/j.issn.1672-741X.2014.02.002
Modified routine method is widely used in the calculation of the internal force of shieldbored tunnels, and the calculation parameters are generally selected according to the experience. In the paper, the key calculation parameters of ground penetrating shieldbored tunnel in the modified routine method, i.e., the stiffness reduction ratio (η) and the moment release ratio (ξ), are analyzed on basis of shellspring model, considering the nonlinear relationship between the bending stiffness and axial bending moment of the segment joints. Conclusions drawn are as follows: 1) For shieldbored tunnel with supershallow overburden, the minimum value in the specified range of specifications should be adopted for stiffness reduction ratio (η) and the maximum value should be adopted for the moment release ratio (ξ); 2) When the top of the tunnel is above the ground surface, value 1 should be adopted conservatively.
/
| 〈 |
|
〉 |