- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
北京地下直径线前三门隧道上跨地铁联络通道及电力隧道设计方案研究
收稿日期: 2013-11-22
修回日期: 2014-01-10
网络出版日期: 2014-02-27
Design of Qiansanmen Tunnel of Beijing Underground Rail Transit Line Crossing above Existing Metro Connection Gallery and Existing Power Tunnel
Received date: 2013-11-22
Revised date: 2014-01-10
Online published: 2014-02-27
郭剑勇 . 北京地下直径线前三门隧道上跨地铁联络通道及电力隧道设计方案研究[J]. 隧道建设, 2014 , 34(2) : 147 -152 . DOI: 10.3973/j.issn.1672-741X.2014.02.010
Qiansanmen tunnel of Beijing Underground Rail Transit Line crosses above existing Metro connection gallery and existing power tunnel. The design scheme of “isolating pile protection and sequence excavation” is proposed for the tunnel. The sequence excavation of the tunnel is simulated, and the displacement of the existing Metro connection gallery during tunnel construction is calculated, so as to guarantee the safety of the existing structures in the urban area. Conclusions drawn are as follows: The scheme of isolating pile protection and sequence excavation adopted is feasible and that the safety of the existing Metro connection gallery and the existing power tunnel can be guaranteed.
/
| 〈 |
|
〉 |