长春地铁1号线解放大路站一次扣拱暗挖逆作法施工地表沉降分析与控制
收稿日期: 2013-11-12
修回日期: 2014-01-09
网络出版日期: 2014-03-20
Analysis on and Control of Ground Surface Settlement: Case Study on Jiefangdalu Station of Line 1 of Changchun Metro Constructed by Topdown Construction Method under Protection of Castinsitu Arch
Received date: 2013-11-12
Revised date: 2014-01-09
Online published: 2014-03-20
李春奎 . 长春地铁1号线解放大路站一次扣拱暗挖逆作法施工地表沉降分析与控制[J]. 隧道建设, 2014 , 34(3) : 264 -268 . DOI: 10.3973/j.issn.1672-741X.2014.03.014
Jiefangdalu station is an interchange station between Line 1 and Line 2 of Changchun Metro. The station is constructed by topdown construction method under the protection of castinsitu arch. The excavation sequence of the pilot tunnels is optimized so as to shorten the construction period and facilitate the construction organization. The ground surface settlement data of the station is analyzed and the pattern of the ground surface settlement of stations in Northeast China constructed by topdown construction method under the protection of castinsitu arch is obtained. The causes for the ground surface settlement are analyzed in terms of ground conditions, construction techniques and construction process. Countermeasures, including grouting reinforcement, proper pilot tunnel construction sequence and proper support dismantling, are proposed so as to control the ground surface settlement.
/
| 〈 |
|
〉 |