- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
成都地铁4号线砂卵石地层土压平衡盾构施工技术
收稿日期: 2013-09-30
修回日期: 2014-01-23
网络出版日期: 2014-03-20
基金资助
国际合作专项(No.2011DFB71550); 洛阳市应用技术研究与开发资金项目(1301065A)
Tunneling by EPB Shield in Gravel Strata: Case Study on Line 4 of Chengdu Metro
Received date: 2013-09-30
Revised date: 2014-01-23
Online published: 2014-03-20
冯欢欢 , 杨书江 . 成都地铁4号线砂卵石地层土压平衡盾构施工技术[J]. 隧道建设, 2014 , 34(3) : 274 -279 . DOI: 10.3973/j.issn.1672-741X.2014.03.016
Located in gravel strata, the fourth bid section of Phase I project of Line 4 of Chengdu Metro is built by an EPB shield. In the paper, the harmonized control of the key boring parameters is analyzed in terms of advance speed, thrust, cutterhead torque, muck releasing quantity, simultaneous grouting and excavation chamber pressure, so as to ensure the stability of the tunnel face and to ensure safe and efficient boring. The causes for the difficulties encountered in tunneling, including rotation of segment rings, boring along smallradius curves and delayed settlement, are analyzed and countermeasures are proposed, so as to ensure good works quality.
/
| 〈 |
|
〉 |