南京地铁3号线浦珠路站满足大直径盾构整体始发结构托换技术研究
收稿日期: 2014-01-06
修回日期: 2014-02-25
网络出版日期: 2014-04-25
Study on Underpinning of Puzhulu Metro Station on Line 3 of Nanjing Metro to Achieve Integral Launching of Largediameter Shield Machine
Received date: 2014-01-06
Revised date: 2014-02-25
Online published: 2014-04-25
刘方明 . 南京地铁3号线浦珠路站满足大直径盾构整体始发结构托换技术研究[J]. 隧道建设, 2014 , 34(4) : 343 -350 . DOI: 10.3973/j.issn.1672-741X.2014.04.009
According to the original design, separate launching of a large diameter shield machine is to be made at Puzhulu Station on Line 3 of Nanjing Metro In the later stage, however, it is decided that integral shield machine launching is to be implemented to replace the original separate launching Therefore, the structure of the Metro station should be treated In the paper, the influence of the integral launching of the large diameter shield machine on the Metro station is analyzed, the key points of the treatment of the structure of the Metro station are summarized, solution of underpinning by concrete beams and columns is proposed, and calculation is made for the underpinning system by means of 2D and 3D models based on SAP2000 finite element software Conclusion is drawn that the underpinning system adopted for the Metro station is feasible and rational
/
| 〈 |
|
〉 |