- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
齐热哈嗒尔高地温引水发电隧洞施工影响分析及降温措施研究
收稿日期: 2014-01-22
修回日期: 2014-02-09
网络出版日期: 2014-04-25
Hydropower Tunnel in High Geothermal Condition: Influences of High Ground Temperature and Countermeasures
Received date: 2014-01-22
Revised date: 2014-02-09
Online published: 2014-04-25
宿辉 , 张宏 , 耿新春 , 唐阳 , 汪健 . 齐热哈嗒尔高地温引水发电隧洞施工影响分析及降温措施研究[J]. 隧道建设, 2014 , 34(4) : 351 -355 . DOI: 10.3973/j.issn.1672-741X.2014.04.010
The highest temperature measured at the working face of Qireha tal hydropower tunnel reaches 110 ℃, which has serious influence on the tunnel construction. In the paper, the causes for the high ground temperature are analyzed, the influences of the high ground temperature on the tunnel construction are studied, and cooling measures are proposed, so as to guarantee the successful construction of the tunnel. The study result shows that: 1) The region possesses very high heat flow value, and the heat flux transfers to the ground surface along the faults, thus forming the high ground temperature section; 2) Technologies used, such as tunnel ventilation combined with local ventilation and cold water and artificial ice, can solve the high ground temperature problem.
/
| 〈 |
|
〉 |