深圳地铁11号线车公庙站—红树湾站区间盾构隧道小净距上穿既有线区间隧道施工关键技术
收稿日期: 2013-12-25
修回日期: 2014-03-10
网络出版日期: 2014-04-25
Key Construction Technologies for Shieldbored Tunnel of Chegongmiao StationHongshuwan Station Section on No. 11 Line of Shenzhen Metro Crossing Closely above Existing Metro Line
Received date: 2013-12-25
Revised date: 2014-03-10
Online published: 2014-04-25
李建设 , 陈慧超 , 李政 . 深圳地铁11号线车公庙站—红树湾站区间盾构隧道小净距上穿既有线区间隧道施工关键技术[J]. 隧道建设, 2014 , 34(4) : 374 -379 . DOI: 10.3973/j.issn.1672-741X.2014.04.014
In recent years, it is normal that tunnels under construction cross closely above existing Metro structure in urban areas. As a result, studies on the control of the deformation of the existing structure become a hot topic. In the construction of the shieldbored tunnel of Chegongmiao stationHongshuwan station section on No. 11 line of Shenzhen Metro, which crosses closely above the existing Zhuzilin stationQiaochengdong station of No. 1 line of Shenzhen Metro, technologies, such as reinforcement of ground above the existing Metro line, shield boring control technology and existing structure monitoring technology, are used. In the end, the deformation of the existing structure has been brought under effective control, and the safety of the shieldbored tunnel and the operation of the existing Metro line have been guaranteed.
/
| 〈 |
|
〉 |