郑州地铁1号线会—民盾构区间锚索拔除施工技术
收稿日期: 2014-01-20
修回日期: 2014-03-05
网络出版日期: 2014-05-14
Anchoring Cable Removing Technology: Case Study on HuiMin Shieldbored Tunnel on Line 1 of Zhengzhou Metro
Received date: 2014-01-20
Revised date: 2014-03-05
Online published: 2014-05-14
李广良 . 郑州地铁1号线会—民盾构区间锚索拔除施工技术[J]. 隧道建设, 2014 , 34(5) : 494 -498 . DOI: 10.3973/j.issn.1672-741X.2014.05.016
There are lots of existing deep anchoring cables in the scope of HuiMin shieldbored tunnel on Line 1 of Zhengzhou Metro. These anchoring cables should be removed before shield arrives, otherwise they may have severe impact on the shield boring. In the paper, comparison and contrast is made among three anchoring cable removing technologies, i.e., removing the anchoring cables from opencut foundation pit, removing the anchoring cables from mined tunnel and removing the anchoring cables from cut holes, in terms of construction period and cost. In the end, the technology of removing the anchoring cables from cut holes is adopted. The details of the technology of removing the anchoring cables from cut holes are presented.
Key words: rail transit; underground space; anchoring cable removing; cuthole
/
| 〈 |
|
〉 |