水下隧道工程实践面临的挑战、对策及思考
收稿日期: 2014-03-13
修回日期: 2014-04-10
网络出版日期: 2014-06-16
Challenges in Construction of Underwater Tunnels and Countermeasures
Received date: 2014-03-13
Revised date: 2014-04-10
Online published: 2014-06-16
钱七虎 . 水下隧道工程实践面临的挑战、对策及思考[J]. 隧道建设, 2014 , 34(6) : 503 -507 . DOI: 10.3973/j.issn.1672-741X.2014.06.001
The advantages and disadvantages of three major underwater tunnel construction methods, including drill and blast method, TBM/shield method and immersed tube method, are presented. Comparison and contrast is made among the three mentioned construction methods in terms of geological conditions, water flow velocity, water surface transportation, cover depth, number of traffic lanes, water leakage, work quantity, construction period, construction safety and construction cost. Finally, major challenges in the construction of underwater tunnels and their countermeasures are analyzed. In the construction of immersed tunnels, the erosion of the riverbed, the phenomenon of the local parts of tube elements being higher than the riverbed and the increasing cover depth are big challenges; in the TBM/shield method, boring under shallow cover, wearing of cutter heads and cutting tools, increasing cover depth, damage of main bearing and boring in fault and fracture zones are big challenges.
/
| 〈 |
|
〉 |