大直径江底盾构隧道衬砌结构受力现场测试与分析
收稿日期: 2014-04-10
修回日期: 2014-05-15
网络出版日期: 2014-07-16
基金资助
省级工程建设产学研结合创新计划项目(KY201126); 中南大学研究生自主探索创新基金(2013zzts 051)
Field Test and Analysis on Stress of Lining of LargeDiameter Rivercrossing Shield Tunnel
Received date: 2014-04-10
Revised date: 2014-05-15
Online published: 2014-07-16
梁禹 , 苏文辉 , 方理刚 , 阳军生 . 大直径江底盾构隧道衬砌结构受力现场测试与分析[J]. 隧道建设, 2014 , 34(7) : 637 -641 . DOI: 10.3973/j.issn.1672-741X.2014.07.007
Longterm field test is made on the stress of the segments of Nanhu Road Tunnel in Changsha, the rule of the timedependent variation of the applied load and internal force is summarized, the distribution of the internal force in different construction stages is studied by means of beamspring model and comparison is made between the study result and the field test result. The research result shows that: 1) Eccentric load state is easily formed when the segments move out of the shield tail; 2) Grouting has great effect on the distribution of the internal force, which increases significantly because of the grouting; 3) With the monitoring going on, the internal force, especially the axial force, still has a small increase.
/
| 〈 |
|
〉 |