卵砾石层管推进工程超挖及卡钻对管材与土壤互制行为的影响研究
收稿日期: 2014-06-16
网络出版日期: 2014-08-11
Analysis of Overcut and Stuck Effects on Interaction between Soilpipe and Ground when PipeJacking in Gravel Formations
Received date: 2014-06-16
Online published: 2014-08-11
寿克坚 , 谢其颖 . 卵砾石层管推进工程超挖及卡钻对管材与土壤互制行为的影响研究[J]. 隧道建设, 2014 , 34(增刊) : 48 -55 . DOI: 10.3973/j.issn.1672-741X.2014.S.008
NoDig construction in the city might still encounter of difficulties. However, the difficulties or obstacles, which might cause schedule delays and damage to the pipes. This study considered different overcut range, sticking position, resistance, jacking force, and the location of jacks, etc., for the straight line and curved pipe-jacking. The ABAQUS finite element software was applied for threedimensional numerical simulations for straight line pipejacking with different difficult situations.
Key words: nodig; pipejacking; numerical analysis; overcut; stuck
/
| 〈 |
|
〉 |