高速公路扩建对下伏高速铁路隧道安全状态的影响研究
收稿日期: 2014-05-20
修回日期: 2014-05-27
网络出版日期: 2014-08-11
基金资助
国家自然科学基金项目(51108387,51178399)
Study on Safety State of Existing Highspeed Railway Tunnel Influenced by above Expressway Upgrade Construction
Received date: 2014-05-20
Revised date: 2014-05-27
Online published: 2014-08-11
依托连霍高速公路扩建工程通过郑西高铁阌乡隧道上方这一典型案例,采用FLAC3D有限差分程序对施工过程进行三维仿真分析。从横断面、纵剖面的变形两个方面对高速铁路隧道安全状态进行了研究。从纵剖面来看,仰拱位移普遍小于拱顶位移,且受地形和隧道与开挖区域的相对位置影响,最大位移发生在50 m位置处的拱顶,量值为6.3 mm,每10 m的最大差异沉降为0.97 mm,小于高速铁路轨道变形要求;从横断面来看,隧道结构由于上部开挖导致卸荷效应,整体呈现隆起趋势,其位移方向趋向于开挖区域。现场施工和监测表明通过采用竖向分层、纵向分段的开挖方式,阌乡隧道的结构变形量得到有效控制,保证了扩建工程的施工安全与高速铁路隧道的运营安全。
王中平 . 高速公路扩建对下伏高速铁路隧道安全状态的影响研究[J]. 隧道建设, 2014 , 34(增刊) : 77 -81 . DOI: 10.3973/j.issn.1672-741X.2014.S.012
The upgrade project of LianHuo expressway crosses over Wenxiang tunnel on ZhengzhouXi’an highspeed railway. In the paper, 3D simulation analysis is made on the construction process of the expressway upgrade by means of FLAC 3D finite difference program. The safety state of the highspeed railway tunnel is studied in terms of displacement in both crosssection and longitudinal profile. Conclusions drawn are as follows: 1) In the longitudinal profile, the displacement of the invert is less than that of the crown, the displacement is influenced by both the topography and by the relationship between the tunnel and the expressway upgrade excavation area, the maximum displacement (6.3mm) occurs at the crown at Station 50m, and the maximum differential settlement in every 10m section is 0.97mm, which is smaller than the limit value of the highspeed railway tracks; 2) In the crosssection, due to the unloading effect caused by the overlying expressway upgrade excavation, the tunnel structure has a uplift tendency toward the excavation area; 3) The upgrade construction practice and the monitoring data show that, due to the layerbylayer excavation in vertical direction and sectionbysection excavation in longitudinal direction adopted, the structural deformation of Wenxiang tunnel has been brought under effective control, and the construction safety of the expressway upgrade works and the operation safety of the highspeed railway tunnel have been guaranteed.
Key words: expressway upgrade; highspeed railway tunnel; safety state; FLAC3D
/
| 〈 |
|
〉 |