顶湖—仙渡345 kV地下输电线路工程设计与施工
收稿日期: 2014-06-15
网络出版日期: 2014-08-11
Design and Construction of a 345 kV Underground Cable Line Project on Dinghu E/SSiandu E/S Section
Received date: 2014-06-15
Online published: 2014-08-11
陈信吉 , 陈聪海 , 李魁士 , 陈文通 . 顶湖—仙渡345 kV地下输电线路工程设计与施工[J]. 隧道建设, 2014 , 34(增刊) : 172 -179 . DOI: 10.3973/j.issn.1672-741X.2014.S.028
In order to increase the electricity consumption of metropolitan area, and reduce the environmental and urban landscape impact during construction, TPC constructed the shield tunnel with Dinghu E/S-Siandu E/S 345kV underground cable lines in Beitou District, Taipei City. Shield tunnel has penetrated through soft and hard stratum, high pressure of ground water, below the Guandu tunnel of MRT Danshuei Line and close to Dadu road bridge. In order to reduce the impact of the construction, we used the program of big hole and two seal of ring, and adjusted the position and angles of start shaft.
Key words: underground cable line tunnel; shield tunneling; power line
/
| 〈 |
|
〉 |