大直径盾构隧道穿黄河关键技术研究
收稿日期: 2013-02-21
修回日期: 2014-06-20
网络出版日期: 2014-08-11
Study on Key Technologies of Large Diameter Tunnel Crossing underneath Yellow River
Received date: 2013-02-21
Revised date: 2014-06-20
Online published: 2014-08-11
周鲁 , 孙晓玲 . 大直径盾构隧道穿黄河关键技术研究[J]. 隧道建设, 2014 , 34(增刊) : 191 -195 . DOI: 10.3973/j.issn.1672-741X.2014.S.031
In this paper, 3 key construction technologies, including safe overburden thickness, influence on dike, and tunnel segment structure and connection waterproofing of large diameter tunnel crossing underneath Yellow river, are studied. Conclusions drawn are as follows: 1) Minimum buried depth of tunnel and the longitudinal alignment of the tunnel are obtained; 2) Influence on dike is checked; 3) Tunnel segments, segment joints and elastic gasket used for waterproofing of tunnel segments are designed, and the waterproof reliability of segment joints is checked.
/
| 〈 |
|
〉 |