- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
明挖地铁车站与高耸结构结合设计的方案分析
收稿日期: 2014-02-21
修回日期: 2014-07-07
网络出版日期: 2014-08-11
Case Study on Design of Combination of Cutandcover Metro Station and Tower Structure
Received date: 2014-02-21
Revised date: 2014-07-07
Online published: 2014-08-11
吴琼 , 李利 . 明挖地铁车站与高耸结构结合设计的方案分析[J]. 隧道建设, 2014 , 34(增刊) : 213 -216 . DOI: 10.3973/j.issn.1672-741X.2014.S.034
A high statue structure needs to be designed together with the design of a cutandcover Metro station. Regarding the design of the foundation of the high statue structure, three options, i.e., “π”shaped foundation, boxshaped foundation and transfer beam foundation, are proposed. Comparison and contrast is made among these three design options and it is concluded that the transfer beam foundation is a good solution for the case. The mechanical calculation analysis of the transfer beam foundation is summarized and it is suggested that, in the calculation of the transfer beams, the beam in one direction should be taken as the main loadbearing beam, while the beam in the other direction should be regarded as safety reserves.
/
| 〈 |
|
〉 |