曾文水库永久河道放水道防淤改善工程介绍
Introduce of Tsengwen Reservoir Permanent River Outlet (T.R.P.R.O.) Siltation Prevention Improvement Project
Received date: 2014-06-16
Online published: 2014-08-11
黄世伟 , 徐立政 , 高士伟 , 胡文丰 . 曾文水库永久河道放水道防淤改善工程介绍[J]. 隧道建设, 2014 , 34(增刊) : 240 -246 . DOI: 10.3973/j.issn.1672-741X.2014.S.038
For improving reservoir desilting operating functions to accelerate reservoir management and the maintained reservoir operating life, so that using jet flow gate to replace existing HowellBunger valve in Tsengwen Reservoir Permanent River Outlet (T.R.P.R.O.) at southern of Taiwan. Except building three new article tunnels respectively provides construction maintenance and the ventilation needs outside, tie Jet gate room space needs, the original valve gate room will expansion upwards, and set doubletrack wire rope hoists to settlement what HowellBunger valve due to row sand wear and air volume insufficient, and the followup equipment maintenance update and transport problem. To enhance reservoir operation safety, it will priority open jet flow gate facility during typhoon and flood period, excluding density current or muddy lake high concentrations of silt and reduce siltation and improve the efficiency of reservoir desilting.
/
| 〈 |
|
〉 |