大断面隧道浅埋段盖挖法施工实例
收稿日期: 2013-10-22
修回日期: 2014-07-02
网络出版日期: 2014-08-11
Case Study on Covered Excavation in Large Crosssection and Shallowburied Tunnel
Received date: 2013-10-22
Revised date: 2014-07-02
Online published: 2014-08-11
尹学平 , 唐红宁 . 大断面隧道浅埋段盖挖法施工实例[J]. 隧道建设, 2014 , 34(增刊) : 282 -285 . DOI: 10.3973/j.issn.1672-741X.2014.S.043
Covered excavation methods with and without side piles of shallowburied section of Shilin tunnel and Laoxiao No. 1 tunnel on YunanGuilin railway are presented. Key construction technologies of covered excavation method of large crosssection and shallowburied tunnel are summarized. Applicable conditions of covered excavation method are discussed, and the conditions that mining method can be replaced by covered excavation methods are proposed The mentioned conditions includes: coverspan ratio at normal strata is 0.4 ~ 0.6, and coverspan ratio at karst strata is 0.6 ~ 1.0.
/
| 〈 |
|
〉 |