为同时满足双线行车和右线停车线扩大断面的功能需要,西安地铁一号线枣园北路站—汉城路站区间采用非等大断面小净距黄土地铁隧道。针对断面不等大、盾构法与新奥法组合施工方案、小净距黄土地铁隧道的特点,进行了左线小断面盾构法、右线大断面双侧壁导坑法或CRD法双线依次先后贯通3种施工方案的数值模拟与比选分析。计算结果表明,与先贯通小洞、后开挖大洞的方案相比较,采用先新奥法贯通大断面隧道、后盾构法掘进小断面隧道的施工方案对围岩扰动较小,能更有利于控制地表变形;双侧壁导坑法较CRD法虽更能充分体现围岩的自承能力,有效发挥初期支护的承载能力,提高二次衬砌的安全储备,但若将先贯通的大断面隧道施工方案由双侧壁导坑法改为CRD法,可在确保工程安全的前提下降低施工成本,并加快施工进度,顺利地完成隧道建设。
丁改改 , 姜海 , 孔祥兴 . 非等大断面小净距地铁隧道施工方案分析及优化[J]. 隧道建设, 2014 , 34(8) : 715 -720 . DOI: 10.3973/j.issn.1672-741X.2014.08.002
A portion of the running tunnel from Zaoyuan North Road Station to Hancheng Road Station on No. 1 line of Xi’an Metro is designed as a closelyspaced Metro tunnel with different crosssection dimensions. The parallel tunnel tubes have such features as different crosssection dimensions, dual construction methods (shield tunneling method and NATM) and small spacing. Numerical simulation is made on the construction of the left small crosssection tunnel tube by shield tunneling method and the right large crosssection tunnel tube by double side drift method and CRD method. The calculation results show that: 1) Compared to the scheme that the left small crosssection tunnel tube is broken through before the right large crosssection tunnel tube is excavated, the scheme that the right large crosssection tunnel tube is broken through by NATM before the left small crosssection tunnel tube is bored by shield has smaller disturbance on the surrounding rock mass and is more helpful for ground deformation control; 2) Compared to CRD method, double side drift method is more helpful to making full use of the selfsupport capacity of the surrounding rock mass, is more helpful to making full use of the loadbearing capacity of the primary support, and is more helpful to improving the safety reserve of the secondary lining; however, if CRD method is adopted for the right large crosssection tunnel tube, which is broken through before the left small crosssection tunnel tube, the construction cost can be reduced, the construction progress can be improved and the tunnel can be constructed successfully under safe conditions.
/
| 〈 |
|
〉 |