- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
厦门地铁复杂地质条件下盾构法施工技术探讨
收稿日期: 2014-05-19
修回日期: 2014-06-20
网络出版日期: 2014-08-21
Shield Tunneling Technologies for Xiamen Metro under Complex Geological Conditions
Received date: 2014-05-19
Revised date: 2014-06-20
Online published: 2014-08-21
杨书江 . 厦门地铁复杂地质条件下盾构法施工技术探讨[J]. 隧道建设, 2014 , 34(8) : 765 -770 . DOI: 10.3973/j.issn.1672-741X.2014.08.010
The shield tunneling of Line 1 of Xiamen Metro is studied in terms of geology survey, shield selection, shield boring under complex geological conditions and assistant construction methods, so as to ensure the successful construction of the project. Conclusions drawn are as follows: 1) Detailed engineering geological and hydrogeological survey is the basis for the construction of the project; 2) Shield suitable for the geological conditions of the project is fundamental for the construction of the project; 3) Proper shield boring parameters and proper assistant construction methods are guarantee for the construction of the project.
/
| 〈 |
|
〉 |