- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
GPST工法管片接缝防水技术研究
收稿日期: 2013-11-01
修回日期: 2014-07-07
网络出版日期: 2014-09-22
基金资助
上海市科学技术委员会科研计划项目(11231202703)
Study on Waterproofing Joints of Segments in GPST Method
Received date: 2013-11-01
Revised date: 2014-07-07
Online published: 2014-09-22
宁佐利 . GPST工法管片接缝防水技术研究[J]. 隧道建设, 2014 , 34(9) : 844 -848 . DOI: 10.3973/j.issn.1672-741X.2014.09.005
Joint is the main part where leakage occurs in shield tunnels, and the waterproofing of the joint surface is the key of the waterproofing of shield tunnels. The waterproofing of the joints of shield tunnels depends on the compression of the water sealing materials on the contact surface of the joints under the action of the contact pressure. However, the contact pressure is influenced by the dislocation and opening of the joints. Regarding GPST ( Ground Penetrated Shield Technology) applied in the construction of Nanjing Metro, the shield is boring under supershallow soil cover or even without soil cover, the thrust force of the cylinders is inadequate, which results in insufficient compression and compactness of the water sealing strips. Tests and simulations are made in order to solve the abovementioned problems and water sealing strips with low hardness and high porosity suitable for segments under shallow soil covers are developed. The waterproofing tests on the water sealing strips developed demonstrate that the water sealing strips developed can meet the longterm waterproofing requirements of the segments of the mentioned project.
/
| 〈 |
|
〉 |