- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
泥水盾构带压开舱时泥浆配制及泥膜形成实验研究
收稿日期: 2013-07-15
修回日期: 2013-11-21
网络出版日期: 2014-09-22
基金资助
国家自然科学基金项目(51408191); 中国博士后科学基金资助项目(2014M560388); 江苏省博士后科研资助计划项目(1301031B)
Experimental Study on Preparation and Filter Membrane Formation of Slurry during Hyperbaric Operation in Tunneling by Slurry Shield
Received date: 2013-07-15
Revised date: 2013-11-21
Online published: 2014-09-22
闵凡路 , 姜腾 , 魏代伟 , 张亚洲 . 泥水盾构带压开舱时泥浆配制及泥膜形成实验研究[J]. 隧道建设, 2014 , 34(9) : 857 -861 . DOI: 10.3973/j.issn.1672-741X.2014.09.007
During the construction of underwater tunnels, the boring of the shields has often to be stopped to check and repair the cutting tools under hyperbaric conditions. However, how to adjust the slurries to form a dense filter membrane on the excavation face so as to maintain the stability of the excavation face is still a problem to be solved. In the paper, experimental study is made on the preparation and filter membrane formation of slurries, with the hyperbaric operation of shield in gravel and sand strata during the construction of Nanjing Yangtze River Tunnel as an example. A series of tests are made on the preparation and filter membrane formation of different slurries. A twosep slurry adjustment program, i.e, firstly, slurry with low density and low viscosity is used to infiltrate into the sand strata, then slurry with large density and large viscosity is used to form a filter membrane on the excavation face, is proposed. The program proposed has been applied in the hyperbaric operation during the construction of Nanjing Yangtze River Tunnel, airtight filter membrane has been formed and the stability of the excavation face has been guaranteed. The experience can provide valuable reference for the slurry preparation in other similar projects.
/
| 〈 |
|
〉 |