Case Study on Transverse Ground Surface Settlement of Land Section of Shiziyang Tunnel Bored by Shield
Received date: 2014-07-29
Revised date: 2014-09-09
Online published: 2014-12-17
杨延栋 , 陈馈 , 李凤远 , 周建军 . 狮子洋隧道陆地段盾构施工横向地表沉降研究[J]. 隧道建设, 2014 , 34(12) : 1143 -1147 . DOI: 10.3973/j.issn.1672-741X.2014.12.005
In this paper, the transverse ground surface settlement of DIK42+660 crosssection of land section of Shiziyang tunnel induced by shield boring is calculated by means of Peck formula The ground is numerically simulated by means of ANSYS finite element model, and the transverse ground surface settlement values are obtained from the numerical simulation results The transverse ground surface settlement values obtained by means of theoretical analysis and numerical simulation respectively are estimated by means of comparing them with the measured values The paper can provide reference for the prediction of ground surface settlement of shieldbored tunnel of similar projects in the future
/
| 〈 |
|
〉 |