- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
西安地铁一号线盾构隧道下穿朝阳门段城墙沉降数值模拟分析
收稿日期: 2014-06-05
修回日期: 2014-10-20
网络出版日期: 2015-02-09
Numerical Simulation and Analysis of Settlement of City Wall of Chaoyang Gate due to Underneath Tunneling of Line 1 of Xi’an Metro
Received date: 2014-06-05
Revised date: 2014-10-20
Online published: 2015-02-09
康佐 , 王军琪 , 邓国华 , 文保军 . 西安地铁一号线盾构隧道下穿朝阳门段城墙沉降数值模拟分析[J]. 隧道建设, 2015 , 35(1) : 9 -15 . DOI: 10.3973/j.issn.1672-741X.2015.01.002
A threedimensional finite element model is established to study the settlement mechanism of the city wall in Xi’an, with a shield tunnel on Line 1 of Xi’an Metro crossing underneath the city wall of Chaoyang Gate and Chaoyang Gate openings as the background. Force analysis is made on the ancient city wall and the settlement of the city wall and the ground nearby is predicted. Reinforcement measures are determined on basis of the analysis results. The numerical simulation and the engineering practice show that: 1) Under the condition of the optimized construction methods, route locations and route depths, the reinforcement measures taken can bring the settlement and deformation of the city wall under control; 2) The numerical simulation results are basically consistent with the regularity of the settlement of the city wall, although they are some conservative; 3) The settlement control standard proposed, which can meet the requirements of the tunnel construction and the protection of the cultural relics, can be used as reference for similar projects in the future.
/
| 〈 |
|
〉 |