大断面黄土隧道三岔口区域前期变形分析及开挖优化
收稿日期: 2014-08-19
修回日期: 2014-11-20
网络出版日期: 2015-02-09
Early Deformation Analysis and Excavation Optimization of Junction Sections of Large Crosssection Loess Tunnels
Received date: 2014-08-19
Revised date: 2014-11-20
Online published: 2015-02-09
王玥 , 史继尧 . 大断面黄土隧道三岔口区域前期变形分析及开挖优化[J]. 隧道建设, 2015 , 35(1) : 83 -88 . DOI: 10.3973/j.issn.1672-741X.2015.01.014
The regularity of the deformation of the junction sections of tunnels in No. 14 bid section of BaojiLanzhou passenger dedicated line is studied on basis of the monitoring results, so as to improve the construction safety of critical positions of large crosssection loess tunnels. It is concluded that the intermediate bench excavation and the invert casting are critical points in terms of deformation development and deformation control. Furthermore, the maximum deformation of the junction section of No. 3 inclined shaft of Guchengling tunnel is predicted on basis of the study results, and the excavation method is optimized accordingly. In the end, the deformation of the mentioned junction section has been well controlled.
/
| 〈 |
|
〉 |