盾构施工工艺对铁路路基沉降影响的数值分析
收稿日期: 2014-09-22
修回日期: 2014-11-30
网络出版日期: 2015-02-11
基金资助
江西省研究生创新基金(YC2013-S169)
Numerical Analysis on Railway Subgrade Settlement Induced by Shield Tunneling
Received date: 2014-09-22
Revised date: 2014-11-30
Online published: 2015-02-11
黄文君 , 郑明新 , 欧阳林 , 邹文亮 , 陈养强 . 盾构施工工艺对铁路路基沉降影响的数值分析[J]. 隧道建设, 2015 , 35(2) : 128 -133 . DOI: 10.3973/j.issn.1672-741X.2015.02.005
The construction of No. 1 Line of Fuzhou Rail Transit crossing underneath Fuzhou Railway Station is simulated by means of MIDAS/GTS finite element software, and the rules of the shield tunneling parameters on the settlement of the existing railway subgrade are studied. The analysis shows that the settlement of the railway subgrade can be brought under effective control by prereinforcing the railway subgrade, by choosing rational excavation chamber pressure (1.2~1.5 times soil pressure) and rational grouting pressure (1.1~1.2 times soil weight stress), and by using proper shield tail grouting rate.
/
| 〈 |
|
〉 |