- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
北京昌平线二期地铁盾构侧穿桥梁沉降监测分析
收稿日期: 2014-10-11
修回日期: 2014-12-01
网络出版日期: 2015-02-11
Analysis on Settlement of Bridge Caused by Side Crossing of Shield: Case Study on Shield Tunneling of Phase 2 of Changping Line of Beijing Metro
Received date: 2014-10-11
Revised date: 2014-12-01
Online published: 2015-02-11
李旺旺 , 韦宏鹄 . 北京昌平线二期地铁盾构侧穿桥梁沉降监测分析[J]. 隧道建设, 2015 , 35(2) : 139 -143 . DOI: 10.3973/j.issn.1672-741X.2015.02.007
Deformation and settlement will occur to the ground surface and surrounding buildings in shield tunneling. In the paper, the settlement of the bridge and ground surface in different phases of the construction of the shieldbored tunnel of phase 2 of Changping Line of Beijing Metro are analyzed, so as to minimize the influence of the shield tunneling on the bridge and ground surface. Conclusions drawn are as follows: 1) Differential settlement will occur to the bridge when the shield side crosses the bridge with low earth pressure; 2) Heaving deformation will still occur to the ground surface above the tunnel when the shield passes through the poor backfill layers under shallow cover with low grouting rate. As a result, rational earth pressure and appropriate grouting rate are very important for the safety of the bridge and the ground surface.
/
| 〈 |
|
〉 |