- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
压气条件下大直径泥水盾构饱和法开舱技术
收稿日期: 2014-10-08
修回日期: 2014-11-05
网络出版日期: 2015-02-11
Saturated Hyperbaric Operation under Compressed Air: Case Study on Construction of Weisanlu Rivercrossing Tunnel by Largediameter Slurry Shield
Received date: 2014-10-08
Revised date: 2014-11-05
Online published: 2015-02-11
姚占虎 , 陈方伟 , 陈郁 . 压气条件下大直径泥水盾构饱和法开舱技术[J]. 隧道建设, 2015 , 35(2) : 185 -190 . DOI: 10.3973/j.issn.1672-741X.2015.02.014
The existing hyperbaric operation technologies in tunneling by largediameter slurry shields under complex hydrogeological conditions and complex environment have some disadvantages In the construction of Weisanlu rivercrossing tunnel in Nanning, China, the shield boring has to be suspended to perform repair and maintenance of the cutterhead As a result, the technology of saturated hyperbaric operation under compressed air is proposed In this paper, the geological conditions of the tunnel where the shield stops are studied on basis of the geological prospection report, the working principle of saturated hyperbaric operation under compressed air is presented, the calculation of the pressure at the tunnel face in introduced, and the forming of the airtight filter membrane, the equipment and working procedure of saturated hyperbaric operation under compressed air are expounded The practice shows that the mentioned technology can ensure the successful inspection and replacement of the cutting tools of shield machines under complex conditions, and it can improve the adaptability of shield machines to complex geological conditions
/
| 〈 |
|
〉 |