深埋硬岩特长隧道快速掘进技术研究
收稿日期: 2014-09-22
修回日期: 2014-12-20
网络出版日期: 2015-03-20
Study on Rapid Excavation Technology for Deep Superlong Tunnels in Hard Rock
Received date: 2014-09-22
Revised date: 2014-12-20
Online published: 2015-03-20
李自强 , 于丽 , 王明年 , 代仲宇 . 深埋硬岩特长隧道快速掘进技术研究[J]. 隧道建设, 2015 , 35(3) : 232 -237 . DOI: 10.3973/j.issn.1672-741X.2015.03.007
The application of rapid excavation technology in the construction of deep superlong hard rock tunnels can achieve shorter construction period and thus can result in good economic efficiency. Selecting proper blasting cyclic length, which can minimize the damage to the surrounding rock, is a prerequisite for rapid excavation. In the paper, the broken zone thickness and the deformation of the surrounding rock of Hongtiguan tunnel under 3, 35, 4, 5 m blasting cyclic lengths is evaluated by means of numerical simulation. Theoretical blasting cyclic length is obtained and applied in the tunneling. Finally, rational blasting cyclic length, i.e., 35~4 m in Grade Ⅱ surrounding rock, is proposed on basis of theoretical study and engineering practice.
/
| 〈 |
|
〉 |