- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
人工填土层中四连拱暗挖隧道设计
收稿日期: 2014-11-03
修回日期: 2015-01-27
网络出版日期: 2015-03-20
Case Study on Design of Mined 4arched Tunnel in Artificiallyfilled Soil Strata
Received date: 2014-11-03
Revised date: 2015-01-27
Online published: 2015-03-20
孟伟 , 叶铭 . 人工填土层中四连拱暗挖隧道设计[J]. 隧道建设, 2015 , 35(3) : 250 -256 . DOI: 10.3973/j.issn.1672-741X.2015.03.010
Due to the loose and instable property of artificiallyfilled soil strata, it is difficult to build mined tunnels in such strata. In the paper, the design of a 4arched tunnel of Beijing Metro located in artificiallyfilled soil strata is studied by means of theoretical analysis and finite element numerical simulation. Comparison and contrast is made among three construction methods, i.e., pilot method, side heading method and “pilot method + side heading method”, in terms of stress on the support structure, ground surface settlement, risk control and construction period. Conclusion is drawn that the side heading method is the optimum construction method for the project. The proposed method has been adopted for the project, which shows that the method can minimize the horizontal displacement of the central wall, bring the settlement under effective control, make the secondary lining form a closed ring as early as possible and reduce the stress on the primary support.
/
| 〈 |
|
〉 |