- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
与市政桥梁合建的地铁车站结构设计——以厦门地铁吕厝站为例
收稿日期: 2015-01-19
修回日期: 2015-03-26
网络出版日期: 2015-05-22
Structural Design of Lucuo Station of Xiamen Metro: A Metro Station Integrated with a Municipal Bridge
Received date: 2015-01-19
Revised date: 2015-03-26
Online published: 2015-05-22
赵月 . 与市政桥梁合建的地铁车站结构设计——以厦门地铁吕厝站为例[J]. 隧道建设, 2015 , 35(5) : 439 -442 . DOI: 10.3973/j.issn.1672-741X.2015.05.008
Lucuo station, a transfer station between Line 1 and Line 2 of Xiamen Metro, is designed to be located below an existing municipal bridge. In the paper, the design concept of the Metro station is described, the forcing condition and seismic performance of the bridgestation integrated structure are analyzed by means of numerical simulation. Countermeasrues, such as bridge span matching, structure reinforcement, station column strengthening and installing pile foundations below station columns, are taken to ensure that the structural forcing, settlement and seismic performance of the works can meet relevant requirements.
/
| 〈 |
|
〉 |