开敞式TBM步进技术
收稿日期: 2015-03-19
修回日期: 2015-03-30
网络出版日期: 2015-05-22
Stepping Technology of Opentype TBM
Received date: 2015-03-19
Revised date: 2015-03-30
Online published: 2015-05-22
周雁领 . 开敞式TBM步进技术[J]. 隧道建设, 2015 , 35(5) : 468 -472 . DOI: 10.3973/j.issn.1672-741X.2015.05.013
When a tunnel is built by hardrock TBM, there is a prominent feature that TBM and D&B (drill and blast) are used in the same tunnel. Therefore, stepping of TBM, even longdistance stepping of TBM, has to be made before TBM driving, during site changing of TBM, or after TBM driving. TBM stepping speed will significantly affect the construction period for a project. In the paper, the existing TBM stepping techniques are systematically summarized, and the slidingtype TBM stepping technology, which has been widely applied due to its high efficiency, are presented. The technologies presented include the structure and principle of the slidingtype TBM stepping technology, the stepping process, the main technical points, the application result, the adaptability improvement, and supplementary facilities to which special attention should be paid. Slidingtype TBM stepping technology has many advantages, such as less equipment investment and facility investment, high stepping speed, and being suitable for both longdistance stepping and shortdistance stepping.
/
| 〈 |
|
〉 |