施工技术

季节性暴雨后某高速公路隧道病害及整治

  • 刘赟君 ,
  • 谢蒙均 ,
  • 黄丹 ,
  • 满银 ,
  • 韦培富
展开
  • (1. 贵州省交通科学研究院股份有限公司, 贵州贵阳 550008; 2. 中铁五局集团建筑工程有限责任公司, 贵州贵阳 550008)
刘赟君(1988—),男,湖南益阳人, 2014年毕业于西南交通大学,桥梁与隧道工程专业,硕士,助理工程师,主要从事桥梁隧道试验检测和维修加固研究工作。

收稿日期: 2015-01-20

  修回日期: 2015-02-12

  网络出版日期: 2015-05-22

Case Study on Diseases of a Highway Tunnel Occurring after Seasonal Rainstorm and Their Treatment

  • LIU Yunjun ,
  • XIE Mengjun ,
  • HUANG Dan ,
  • MAN Yin ,
  • WEI Peifu
Expand
  • (1 Guizhou Transport Science Research Institute Shares Co, Ltd, Guiyang 550008, Guizhou, China;  2 The Building Construction Co, Ltd under China Railway Wuju Group, Guiyang 550008, Guizhou, China)

Received date: 2015-01-20

  Revised date: 2015-02-12

  Online published: 2015-05-22

摘要

为了解决长时间季节性暴雨后,运营隧道易出现病害的问题,对长时间季节性暴雨后高速公路某运营隧道发生的病害进行调查、监控、数值模拟及分析。研究结果表明: 1)长时间大暴雨后,隧道病害关联性存在,表现为渗漏水、基底隆起、翻浆冒泥、中央排水沟堵塞以及衬砌变形破坏; 2)排水系统堵塞后,隧道衬砌结构上水压力和内力急剧增大,隧道率先在仰拱和墙脚处出现破坏; 3)隧道渗漏水病害采用凿槽引排,变形破坏段采用分段逐步换拱和仰拱施作,整个隧道采用中央排水沟扩挖、沉沙井和排水系统疏导的方法; 4)病害整治期间隧道结构变形较小、收敛,结构安全,整治措施合理可靠。

本文引用格式

刘赟君 , 谢蒙均 , 黄丹 , 满银 , 韦培富 . 季节性暴雨后某高速公路隧道病害及整治[J]. 隧道建设, 2015 , 35(5) : 484 -490 . DOI: 10.3973/j.issn.1672-741X.2015.05.016

Abstract

When longduration seasonal rainstorms happen, diseases are easy to occur to operating tunnels In the paper, the diseases that occurred to a highway tunnel after longduration seasonal rainstorms are investigated, monitored, numerically simulated and analyzed Conclusions drawn are as follows: 1) After longduration rainstorms, interrelated diseases, such as water leakage, floor uplift, mud pumping, central drainage ditch blocking and lining deformation, occur to the tunnel; 2) When the drainage system is blocked, the water pressure on the tunnel lining and the internal force of the tunnel lining increase rapidly, which leads to the damage to the invert and the side wall feet; 3) The following treatment measures are taken: Channels are cut to guide the ground water out so as to eliminate the water leakage disease; the damaged lining is removed section by section, new lining is installed and the invert is reconstructed; the existing central drainage ditch is widened, new sand collection shafts are installed and the drainage system is improved; 4) During the treatment of the tunnel diseases, the deformation of the tunnel structure is small, which demonstrates that the tunnel structure is safe and that the treatment measures taken are reasonable and reliable.