- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2015-03-09
修回日期: 2015-05-27
网络出版日期: 2015-06-25
Selection of Civil Scheme of Superlong Seacrossing Tunnel on No.3 Line of Xiamen Metro
Received date: 2015-03-09
Revised date: 2015-05-27
Online published: 2015-06-25
赵月 . 厦门轨道交通3号线超长跨海地铁隧道土建设计方案比选[J]. 隧道建设, 2015 , 35(6) : 547 -553 . DOI: 10.3973/j.issn.1672-741X.2015.06.009
In this paper, the engineering characteristics and functional requirements of the superlong seacrossing tunnel on No. 3 Line of Xiamen Metro are analyzed. The concept of the civil scheme design of the superlong seacrossing tunnel is presented in terms of geologybased route selection, construction method selection and structural design. The construction method of “shield boring method + mining method + shield boring method”, the scheme of the ventilation and exhaust discharge gallery of the seacrossing section, the selection of the ventilation shaft location and the type of the structural crosssection of the tunnel are presented in detail. Comparison and contrast is made among the scheme of “large crosssection tube + small crosssection tube”, the scheme of “three tubes” and the scheme of “single large crosssection tube”, with the scheme of “large crosssection tube + small crosssection tube” adopted in the end. Furthermore, the construction technologies for the connection between the shield boring section and the mining section, the technologies for the disaster prevention and rescue of the superlong seacrossing Metro tunnel, and the structural waterproofing and drainage technologies of the seacrossing tunnel under high water pressure are studied and discussed, and some suggestions are given.
/
| 〈 |
|
〉 |