深圳地铁盾构穿越建筑群及切削桩基施工
收稿日期: 2015-03-08
修回日期: 2015-04-10
网络出版日期: 2015-06-25
Shield Boring Underneath Buildings by Cutting Existing Foundation Piles: Case Study on Running Tunnel from Grand Theatre Station toLudan Village Station on Line 9 of Shenzhen Metro
Received date: 2015-03-08
Revised date: 2015-04-10
Online published: 2015-06-25
孙波 , 肖龙鸽 , 孙正阳 , 殷明伦 , 罗泽华 . 深圳地铁盾构穿越建筑群及切削桩基施工[J]. 隧道建设, 2015 , 35(6) : 571 -578 . DOI: 10.3973/j.issn.1672-741X.2015.06.013
In this paper, the technologies for shield boring underneath existing buildings from Grand Theater station to Ludan Village station of Shenzhen Metro is determined on basis of studying on relative technologies in China and abroad, so as to guarantee safe shield boring and avoid adverse impact on the existing pile foundations. The practicability of the construction technologies is theoretically analyzed, and the details of the construction technologies are determined. The construction technologies, including ground consolidation, trial boring, shield modification and ground surface secondary grouting, are summarized. In the end, the shield has crossed underneath the buildings successfully, and the safety of the buildings has been guaranteed.
/
| 〈 |
|
〉 |