BT模式下地铁土建工程进度管理经验
收稿日期: 2015-04-20
修回日期: 2015-06-05
网络出版日期: 2015-08-17
Experience in Management of Construction Progress of Civil Works of Metro Project under BT Mode
Received date: 2015-04-20
Revised date: 2015-06-05
Online published: 2015-08-17
赵晓华 , 刘杨 , 崔根群 . BT模式下地铁土建工程进度管理经验[J]. 隧道建设, 2015 , 35(S1) : 5 -10 . DOI: 10.3973/j.issn.1672-741X.2015.S1.002
The following measures are taken to speed up the construction progress of the civil works of Line 1 of Shijiazhuang Metro, which is constructed under BT mode: determining the appropriate target dates of the milestones of the construction and the targets of the construction progress; paying adequate attention to the execution of the preliminary works; promoting the ontime commencement of works of each site; implementing strict control of the sites on the critical path; strengthening the management of the construction companies with their construction schedule lagging behind the targets; performing early warning during the construction; implementing target date examination, special examination and incentive program; ensuring the target dates of station construction, shield boring, tunnel breakthrough, track construction and electrical power supply system installation; optimizing the technological schemes; strengthening the safety and quality control; implementing good cooperation with the designer; ensuring the intime material supply; and helping the government authorities and the Client solve their problems. In the paper, the experience in the construction progress management is presented.
Key words: BT mode; Shijiazhuang Metro; construction progress management
/
| 〈 |
|
〉 |