地铁项目BT模式下的设计管理
收稿日期: 2015-04-20
修回日期: 2015-06-24
网络出版日期: 2015-08-17
Design Management of Metro Works under BT Mode
Received date: 2015-04-20
Revised date: 2015-06-24
Online published: 2015-08-17
林够 . 地铁项目BT模式下的设计管理[J]. 隧道建设, 2015 , 35(S1) : 19 -22 . DOI: 10.3973/j.issn.1672-741X.2015.S1.005
In the paper, the design management of Shijiazhuang Metro under BT mode is presented as follows: The construction contractor of the BT project tries to intervene into the design works to optimize the preliminary design drawings in the preliminary stage, to optimize the construction drawings before the construction of the works is commenced, to optimize the technological scheme in the execution of the works and to control the design changes in the full course, so as to increase the income, save the expenditure and shorten the construction period.
/
| 〈 |
|
〉 |