石家庄轨道交通1号线盾构开挖引起地表沉降分析
收稿日期: 2015-05-22
修回日期: 2015-06-02
网络出版日期: 2015-08-17
Analysis on Ground Surface Settlement Caused by Shield Tunneling: Case Study on Line 1 of Shijiazhuang Metro
Received date: 2015-05-22
Revised date: 2015-06-02
Online published: 2015-08-17
杨三龙 , 王海江 . 石家庄轨道交通1号线盾构开挖引起地表沉降分析[J]. 隧道建设, 2015 , 35(S1) : 41 -47 . DOI: 10.3973/j.issn.1672-741X.2015.S1.009
Ground surface settlement is one of the most important parameters that should be well controlled in shield tunneling. During the construction of Line 1 of Shijiazhuang Metro, the settlement on some specific days reaches the alert value, however, the accumulated settlement value does not reach the alert value, although the shield boring parameters meet the design requirements. In the paper, the causes for the ground surface settlement are analyzed in terms of excavation chamber pressure, simultaneous grouting, grout performance and ground stability, with the data of the running tunnel from Stadium station to Beisong station measured on June 15, 2014 as examples. Finally, the ground settlement under the fine silt sand strata, finemedium sand strata and mediumcoarse sand strata in Shijiazhuang are analyzed.
Key words: Shijiazhuang Metro; shield; surface settlement
/
| 〈 |
|
〉 |