- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
石家庄轨道交通 1 号线地铁隧道管片拼装质量控制问题研讨
收稿日期: 2015-04-21
修回日期: 2015-07-05
网络出版日期: 2015-08-17
Discussion on Segment Erection Quality Control of Shieldbored Tunnels: Case Study on Line 1 of Shijiazhuang Metro
Received date: 2015-04-21
Revised date: 2015-07-05
Online published: 2015-08-17
桂金本 , 冀高山 . 石家庄轨道交通 1 号线地铁隧道管片拼装质量控制问题研讨[J]. 隧道建设, 2015 , 35(S1) : 69 -73 . DOI: 10.3973/j.issn.1672-741X.2015.S1.014
Segment erection quality is one of the important factors that directly affect the quality of the completed tunnel. In the construction of Line 1 of Shijiazhuang Metro, typical defects such as segment damage and segment dislocation occur. In the paper, the causes for the defects of the segment erection are analyzed, and the following countermeasures are taken: 1) Wedge rings are used to adjust the attitude of the shield and the sudden change of the shield attitude is avoided; 2) The thrust force of the thrust cylinders is adjusted, and wedge pads are installed between the segments so as to achieve flat end surface of the segment ring. In the end, the quality of the segment erection has been brought under effective control.
Key words: Shijiazhuang Metro; shield; segment; erection quality; countermeasure
/
| 〈 |
|
〉 |