特长隧道整体贯通前先期铺设无砟轨道施工测量方法探讨
收稿日期: 2015-05-25
修回日期: 2015-06-17
网络出版日期: 2015-08-24
Discussion on Survey Methods for Ballastless Track Construction in Sections of Tunnels That Have Not Been Completely Broken through
Received date: 2015-05-25
Revised date: 2015-06-17
Online published: 2015-08-24
巨邦强 , 付宏平 , 陈光金 , 李志平 . 特长隧道整体贯通前先期铺设无砟轨道施工测量方法探讨[J]. 隧道建设, 2015 , 35(8) : 841 -845 . DOI: 10.3973/j.issn.1672-741X.2015.08.015
Long railway tunnels are normally constructed by means of driving from different construction adits and ballastless track is often designed for the long railway tunnels. At present, the ballastless track is normally laid after the tunnel has been completely broken through, therefore the tight construction schedule of the tunnel cannot be guaranteed. In the paper, the survey methods for the ballastless track construction in sections of tunnels that have not been completely broken through are discussed, an integral solution for the construction survey is provided, and survey methods and countermeasures to guarantee the survey accuracy are proposed. The study shows that the survey for the construction of the ballastless track in sections of tunnels that have not been completely broken through is theoretically feasible. The study result has great significance in improving the construction progress of superlong railway tunnels and ensuring the construction schedule of the tunnels.
/
| 〈 |
|
〉 |