- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
土压平衡盾构全断面富水砂层带压进舱地层气密性封堵及其检测技术
收稿日期: 2015-05-05
修回日期: 2015-07-30
网络出版日期: 2015-09-22
How to Achieve Air Tightness around an EPB Shield Boring in Fullface Waterrich Sand Strata so as to Facilitate Hyperbaric Operation
Received date: 2015-05-05
Revised date: 2015-07-30
Online published: 2015-09-22
孙海波 . 土压平衡盾构全断面富水砂层带压进舱地层气密性封堵及其检测技术[J]. 隧道建设, 2015 , 35(9) : 962 -968 . DOI: 10.3973/j.issn.1672-741X.2015.09.017
Compared to cohesive soil strata, waterrich sand strata have higher porosity, higher permeability and higher water content. When hyperbaric operation is needed during shield boring in waterrich sand strata, it is of great importance to keep the air tightness of the strata around the shield. An EPB shield for Line 3 of Xi’an Metro bores through fullface waterrich sand strata, and hyperbaric operation has to be conducted. The strata around the shield is sealed by bentonite slurry, which is injected through the holes on the shield; the tunnel face is sealed by filter membrane formed by highefficient slurry, the simultaneous grouting and grease injection at the tail shield is enhanced, so as to ensure the air tightness of the sand strata around the shield and in turn to facilitate the hyperbaric operation. Furthermore, a series of air tightness testing and evaluation means are used to verify the sealing effect. In the end, successful air tightness has been achieved and successful hyperbaric operation has been conducted.
/
| 〈 |
|
〉 |