- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2015-08-13
修回日期: 2015-11-06
网络出版日期: 2015-11-25
Numerical Study on Waterproof Failure Mechanism of Elastic Sealing Gasket of Underwater Shieldbored Tunnel
Received date: 2015-08-13
Revised date: 2015-11-06
Online published: 2015-11-25
王湛 . 水下盾构隧道弹性密封垫防水失效数值模拟研究[J]. 隧道建设, 2015 , 35(11) : 1164 -1168 . DOI: 10.3973/j.issn.1672-741X.2015.11.008
In the paper, numerical simulation study is made on the waterproof failure mechanism of elastic sealing gaskets by means of ABAQUS program, with the design of the waterproof system of an underwater shieldbored tunnel as example. The finite element model used in the paper is compared with the previous simplified model, and the waterproof failure mechanism of elastic sealing gaskets in the case of joint opening and that in the case of joint staggering are analyzed respectively. Conclusions drawn are as follows: 1) In the case of joint opening, the water leakage mainly occurs at the contact surface between the sealing gaskets; 2) In the case of joint staggering, the water leakage at the contact surface between the sealing gaskets turns into water leakage at the contact surface between the sealing gasket and the concrete segment as the staggering displacement grows.
/
| 〈 |
|
〉 |