地铁综合接地系统工程施工
收稿日期: 2015-05-29
修回日期: 2015-07-20
网络出版日期: 2015-12-24
Construction of Metro Integrated Grounding System
Received date: 2015-05-29
Revised date: 2015-07-20
Online published: 2015-12-24
吕雪冬 . 地铁综合接地系统工程施工[J]. 隧道建设, 2015 , 35(S2) : 86 -90 . DOI: 10.3973/j.issn.1672-741X.2015.S2.015
In this paper, the site quality control of integrated grounding management of CheHong section on No. 11 Line of Shenzhen Metro is studied, in terms of material control ,construction technology, labor capacity, equipment, construction environment and acceptance program. The paper can provide reference for the grounding management of Metro in the future.
/
| 〈 |
|
〉 |