- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2015-03-26
修回日期: 2015-11-18
网络出版日期: 2015-12-24
Method of Replacing Shield Tail Brushes under High Water Pressure and Shallow Highlypermeable Cover: Case Study on Weisanlu Yangtze River Crossing Tunnel in Nanjing
Received date: 2015-03-26
Revised date: 2015-11-18
Online published: 2015-12-24
李家洋 , 鞠义成 . 浅覆土高水压强透水地层注浆法更换盾尾刷技术[J]. 隧道建设, 2015 , 35(S2) : 108 -114 . DOI: 10.3973/j.issn.1672-741X.2015.S2.019
Freezing method is always used in shield tunneling to facilitate the replacement of the tail brushes. However, the freezing method has such disadvantages as high cost and long construction duration. During the boring of Weisanlu Yangtze River Crossing Tunnel in Nanjing, the tail brushes have to be replaced under high water pressure and shallow highlypermeable cover. Therefore, special segments with embedded radial grouting holes are precast in advance, the grout mixing proportion, the grouting parameters and the grouting process are optimized, and effective grouting is made. In the end, the tail brushes have been replaced successfully. Compared to the conventional freezing method, the grouting method adopted in the project has lower construction cost and shorter construction duration. The practice can provide reference for similar projects in the future.
/
| 〈 |
|
〉 |