Technologies for Largediameter Earth Pressure Balance Shield Boring in Complex Strata
Received date: 2015-05-22
Revised date: 2015-06-19
Online published: 2015-12-24
张萌 , 孙骋 . 大直径土压平衡盾构在复杂地层中的掘进技术探析[J]. 隧道建设, 2015 , 35(S2) : 157 -161 . DOI: 10.3973/j.issn.1672-741X.2015.S2.028
In this paper, the causes for shield launching difficulty are analyzed. The causes for cutter head mud cake, ground settlement and grout burst lies on complex strata, bad ground conditioning effect and shallow cover. The countermeasures, including, adding additives, cutter head cleaning, and using cooling tower, are adopted. The paper can provide reference for similar projects in the future.
/
| 〈 |
|
〉 |