- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
收稿日期: 2015-06-20
修回日期: 2015-10-20
网络出版日期: 2016-01-08
Settlement Control Technology for Tunnel Crossing Underneath Zhongzhou Avenue in Zhengzhou Constructed by Superlarge Rectangular Crosssection Pipejacking Machine
Received date: 2015-06-20
Revised date: 2015-10-20
Online published: 2016-01-08
荣亮 , 杨红军 . 郑州市下穿中州大道超大断面矩形顶管隧道施工沉降控制技术[J]. 隧道建设, 2015 , 35(12) : 1338 -1344 . DOI: 10.3973/j.issn.1672-741X.2015.12.016
The tunnel crossing underneath Zhongzhou Avenue in Zhengzhou has such features as superlarge crosssection, shallow cover, 4 parallel tunnel tubes and small spacing between the tunnel tubes, therefore there is great difficulty in the settlement control. Countermeasures, including simultaneous grouting, secondary grouting, ground conditioning, muck discharge control, soil carrying prevention, control of 6 cutter heads, blind area treatment and backward movement prevention are taken to control the ground settlement. In the end, the settlement is well controlled. The practice shows that the countermeasures taken are feasible and effective.
/
| 〈 |
|
〉 |