天津地铁盾构隧道四线交汇掘进数值分析
收稿日期: 2015-06-29
修回日期: 2015-12-11
网络出版日期: 2016-03-30
基金资助
国家自然科学基金项目(51208303)
Numerical Analysis of Interaction of Excavation of Four Adjacent Shield Tunnels: A Case Study on Tianjin Metro
Received date: 2015-06-29
Revised date: 2015-12-11
Online published: 2016-03-30
徐子川 , 李建高 , 王长虹 . 天津地铁盾构隧道四线交汇掘进数值分析[J]. 隧道建设, 2016 , 36(3) : 295 -300 . DOI: 10.3973/j.issn.1672-741X.2016.03.008
The excavating tunnel has an adverse effect upon the excavated tunnels during the construction of multiple adjacent tunnels. In this paper, the typical crosssection of the connection section between Line No. 5 and Line No. 6 of Tianjin Metro is analyzed by means of FLAC3D software; and then the interaction of excavating the four adjacent shield tunnels in waterrich stratum is simulated. The results show that: 1) The excavated tunnels incline to the excavating tunnel. The vertical displacement of lowerlaid tunnel is more obvious than the horizontal displacement. 2) The ground surface settlement and the settlement scope induced by lowerlaid excavated tunnel are larger than that induced by upperlaid excavating tunnels under seepage action; and it is proved that the influence of seepage action on waterrich ground settlement and settlement scope are larger than those of excavation stress releasing.
/
| 〈 |
|
〉 |