地铁车站附属工程仰挖施工风险及控制措施研究
收稿日期: 2015-12-21
修回日期: 2016-03-03
网络出版日期: 2016-03-30
基金资助
北京市科技新星计划资助项目(Z121106002512086); 北京市国有资本经营预算项目“地铁工程建设科技创新团队”资助
Study on Risk Management and Control Technologies for Downtop Excavation of Ancillary Works of Metro Station
Received date: 2015-12-21
Revised date: 2016-03-03
Online published: 2016-03-30
徐凌 , 罗富荣 . 地铁车站附属工程仰挖施工风险及控制措施研究[J]. 隧道建设, 2016 , 36(3) : 320 -325 . DOI: 10.3973/j.issn.1672-741X.2016.03.012
The downtop excavation method, with large construction risk, could be chosen when the construction scheme is short. The design, construction and management have to be controlled so as to guarantee the safe construction and to reduce the construction risk. In this paper, the comparison is made among the construction methods of ancillary works of mined Metro station on Line No.7 of Beijing Metro in terms of advantages and disadvantages; and then the construction technology and management technology of downtop excavation method are systematically studied. Finally, the construction scheme of downtop excavation method and the rules of ground surface settlement are analyzed. The monitoring data show that the safe construction has been guaranteed; the influence of downtop excavation on surrounding environment has been minimized and the ground surface settlement has been brought under effective control.
/
| 〈 |
|
〉 |