- CSCD核心中文核心科技核心
- RCCSE(A+)公路运输高质量期刊T1
- Ei CompendexScopusWJCI
- EBSCOPж(AJ)JST
大连华昌变电站电缆隧道的套衬加固设计与施工
收稿日期: 2015-08-21
修回日期: 2015-11-18
网络出版日期: 2016-04-27
Design and Construction of Lining Reinforcement of A Cable Tunnel of Huachang Substation in Dalian
Received date: 2015-08-21
Revised date: 2015-11-18
Online published: 2016-04-27
王蓉蓉 , 渐明柱 , 宋超业 . 大连华昌变电站电缆隧道的套衬加固设计与施工[J]. 隧道建设, 2016 , 36(4) : 474 -478 . DOI: 10.3973/j.issn.1672-741X.2016.04.016
Floor structure heaving and lining cracks occurred at an operating cable tunnel of Huachang Substation in Dalian, China. These disasters of the cable tunnel are detected by means of site measuring and core drilling; and then the causes of the disasters are analyzed. It is concluded that the groundwater, the insufficient strength of the primary supporting structure and the bad construction quality comprehensively give rise to the tunnel diseases. Countermeasures, such as temporary translocation of the cables, cutting of floor after borehole drilling and the reinforced concrete lining, are taken. The practice shows that the tunnel structure is stable and the cable runs just fine after using the abovementioned measures.
/
| 〈 |
|
〉 |