地铁盾构隧道下穿高压LNG(液化天燃气)管线距离要求及沉降控制标准探讨
收稿日期: 2015-12-03
修回日期: 2016-02-26
网络出版日期: 2016-05-25
Discussion on Distance Requirement and Settlement Control Standard of Metro Shield Tunnel Crossing Underneath Highpressure Liquefied Natural Gas (LNG) Pipeline
Received date: 2015-12-03
Revised date: 2016-02-26
Online published: 2016-05-25
张竹清 . 地铁盾构隧道下穿高压LNG(液化天燃气)管线距离要求及沉降控制标准探讨[J]. 隧道建设, 2016 , 36(5) : 531 -536 . DOI: 10.3973/j.issn.1672-741X.2016.05.006
The Metro tunnel crossing underneath highpressure liquefied natural gas (LNG) pipelines becomes common as the development of Metro and highpressure LNG pipelines. The distance requirement and settlement control standard of Metro shield tunnel crossing underneath highpressure LNG pipeline in China are not so well developed. The distance requirements and settlement control standard calculation formula of Metro shield tunnel crossing underneath highpressure LNG pipeline are summarized and analyzed by means of theoretical calculation and case studies. The study results can provide reference for determining related requirements.
/
| 〈 |
|
〉 |